CO129-094 - Acting Governor Mercer - 1863 [11-10] — Page 198

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

in a

system of

sewers, are

the for

forms of

the

of

which they

several classes, the materials

are to be composed, and their relative areas.

64.

form of

The

egg shaped or oval is the

sewer proposed by the Committee,

31.

194

to the action of water. The upper part

should be covered with Concrete, and in no

case should Common Chinese Mortar be

such works

employed for

66.

Dressed

stone cut and well

fitted

would be

the side walls and

may at first

first be

and should be adopted for

adopted for the first and

second classes. There

some difficulty about skilled labor, but

can easily

that can e

65.

not well

be

overcome.

The ordinary Chinese brick is

fitted for heavy works of this

description; but if carefully built, with

really good

mortar, bricks might be

used where rapidity of Construction was an object: but in that case cement should

the lower parts, (inverts and

be used

for sides,) which

are

necessarily most exposed

preferable for

inverts, and the Committee believe would in

the end prove

Classes

more economical for

named

just

Great

the two

care must be taken in their

Construction, with reference to the pressure

to which they may

be liable, and to avoid

deposits in the Sewers themselves, the

fall of

of each individual sewer should be kept uniform throughout as far as practicable.

The areas of the various classes

68

must be based on

the

ate areas of aggregate

Edit History

2026-05-19 01:37:57 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
in a system of sewers, are the for forms of the of which they several classes, the materials are to be composed, and their relative areas. 64. form of The egg shaped or oval is the sewer proposed by the Committee, 31. 194 to the action of water. The upper part should be covered with Concrete, and in no case should Common Chinese Mortar be such works employed for 66. Dressed stone cut and well fitted would be the side walls and may at first first be and should be adopted for adopted for the first and second classes. There some difficulty about skilled labor, but can easily that can e 65. not well be overcome. The ordinary Chinese brick is fitted for heavy works of this description; but if carefully built, with really good mortar, bricks might be used where rapidity of Construction was an object: but in that case cement should the lower parts, (inverts and be used for sides,) which are necessarily most exposed preferable for inverts, and the Committee believe would in the end prove Classes more economical for named just Great the two care must be taken in their Construction, with reference to the pressure to which they may be liable, and to avoid deposits in the Sewers themselves, the fall of of each individual sewer should be kept uniform throughout as far as practicable. The areas of the various classes 68 must be based on the ate areas of aggregate
Baseline (Original)
30. in a system of sewers, are the for forms of the of which they several classes, the materials are to be composed, and their relative areas. 64. form of The egg shaped or oval is the sewer proposed by the Committe, 31. 194 to the action of water.. The upper part should be covered with Concrete, and in no case should Common Chinese Mortar be such works employed for 66. Drefed stone cut and well fitted would be the side walls and may at first first be and should be adopted for adopted for the first and second classes. There some difficulty about skilled labor, but can easily that can e 65. not well be overe omů. The ordinary. Chinue brick is fitted for heavy works of this discription; but if carefully built, with really good mortar, bricks might be used where rapidity of Construction was an object: but in that case cement should the lower parts, (inverts and be used for sides,) which are necessarily most exposed preferable for inouts, and the Committee believe would in the end prove Classis ༦༽ more economical for named just Great the tivo care must be taken in their Construction, with reference to the pressure to which then may be liable, and to avoid deposits in the Rewers themselves, the fall of of each individual sewer shoved be thept uniform throughout as far as practicable. The areas of the various classes 68 must be based on the ate areas of aggregate
2026-05-19 01:37:57 · Baseline
View content

30.

in a

system of

sewers, are

the for

forms of

the

of

which they

several classes, the materials

are to be composed, and their relative areas.

64.

form of

The

egg shaped or oval is the

sewer proposed by the Committe,

31.

194

to the action of water.. The upper part

should be covered with Concrete, and in no

case should Common Chinese Mortar be

such works

employed for

66.

Drefed

stone cut and well

fitted

would be

the side walls and

may at first

first be

and should be adopted for

adopted for the first and

second classes. There

some difficulty about skilled labor, but

can easily

that can e

65.

not well

be

overe omů.

The ordinary. Chinue brick is

fitted for heavy works of this

discription; but if carefully built, with

really good

mortar, bricks might be

used where rapidity of Construction was an object: but in that case cement should

the lower parts, (inverts and

be used

for sides,) which

are

necessarily most exposed

preferable for

inouts, and the Committee believe would in

the end prove

Classis

༦༽

more economical for

named

just

Great

the tivo

care must be taken in their

Construction, with reference to the pressure

to which then may

be liable, and to avoid

deposits in the Rewers themselves, the

fall of

of each individual sewer shoved be thept uniform throughout as far as practicable.

The areas of the various classes

68

must be based on

the

ate areas of aggregate

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.